ERG has experience of CCS on a coal-based power station. As part of a large-scale pilot plant treating approx. 2% of the total flue gas, ERG provided the pre-treatment package upstream of the amine adsorption column.
At the site in the UK, the flue gas was treated with limestone DeSOx and ESP particulate removal, but was too contaminated for carbon capture using amine solvents (e.g. monoethanolamine [MEA]), and so required additional pre-treatment. ERG’s skid-mounted packages treated a total of 30,000 m3/hr of flue gas at 55°C and comprised the following stages:
The pilot plant was a success and ERG’s package worked effectively to condition the flue gas upstream of the amine column.