ERG has particular experience treating halogenated semi-metals (BCl3, SiCl4, SiF4, etc) where difficult to handle gelatinous or solid precipitates form on contact with the scrubbing liquor, leading to potential for system blockage.
Every ERG package has materials selected to match the specification. All systems are mechanically designed for the operating and design pressures and temperatures. Common materials include plastics, GRPs and Stainless Steels.
Plastic and GRP vessels are manufactured by ERG’s sister company ERG (Plastic Fabrication) Ltd and skid assembly and testing are managed at our facility in West Sussex.
Refer to our studies.
Contracts can be placed direct by the site owners, although we frequently work through main contractors.
ERG (Air Pollution Control) Ltd
Bridge House Lane
Five Oaks Road, Slinfold, Horsham
West Sussex, RH13 0QW, UK

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication